Septic Permit Coordination
Septic Permit Coordination
A permit and an approved plan are required to construct, alter, repair, extend, or operate an on-site sewage disposal facility.
Wastewater Treatment Plant (WWTP) or Commercial OSSF – Septic System Permit
- We can do permits for you anywhere.
- Need a commercial septic system permit? No problem.
- We handle all of the wastewater design, engineering, soil testing, and application process.
- We can design a facility plan, a facility use plan, and a total site plan for any project, large or small
- This includes a commercial septic permit. This includes a hotel wastewater system, Retreat Center, Restaurant, Brewery, Winery, RV Park, School, office building, convenience store, and more. Any size, anywhere. Have a lake lot?
List of Items Needed for Site Development and OSSF (septic) permit:
- Survey of property by Registered Land Surveyor, showing lot lines, easements, and topographic info.
- Floor Plan of proposed structure, including occupancy & use (for homes, bedroom/baths, for commercial, use of facility, hours of operation, etc.)
- Directions to the property for soil profile analysis test holes.
- If Advanced Treatment System, copy of Affidavit to the Public (notarized), as well as Maintenance Agreement.
- Letter of Authorization to design system, and file for permit (or original application, signed).
- Source of potable water.
- Proof of property ownership (deed or tax statement).
- Site Plan (unless we are designing this for you, as part of OSSF plan).
ALL items are required to file permit paperwork. Missing items will delay the filing of the permit, as well as possibly causing other work, on other projects, to be undertaken while paperwork is gathered.
HAPPY CUSTOMERS!
What our customers say
Insert review
Name L.
Insert content
Name L.
Insert content
Name L.
Insert content
Name L.
Find us
INQUIRE
Contact Us
Thank you for contacting us.
We will get back to you as soon as possible.
Oops, there was an error sending your message.
Please try again later.